− | ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Copper Mountain== |
+ | ==Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Copper Mountain== |
* ''Morrison, R.'', '''Current Plant Conditions at Copper Mountain'''. Presentation to the BC/Yukon Branch Canadian Mineral Processors, November 29, 2012; Vancouver, Canada. |
* ''Morrison, R.'', '''Current Plant Conditions at Copper Mountain'''. Presentation to the BC/Yukon Branch Canadian Mineral Processors, November 29, 2012; Vancouver, Canada. |
||
Line 28: | Line 28: | ||
[[Benchmarking: Bond - Copper Mountain|Show details of benchmarking]] |
[[Benchmarking: Bond - Copper Mountain|Show details of benchmarking]] |
||
− | ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Fort Knox== |
+ | ==Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Fort Knox== |
* ''Magnuson, R.; Hallow, J.; Mosher, J.; Major, K.'', '''The Fort Knox Mill: Design, Commissioning and Operation'''. Proceedings of the SAG 2001 Conference, Vancouver, Canada. |
* ''Magnuson, R.; Hallow, J.; Mosher, J.; Major, K.'', '''The Fort Knox Mill: Design, Commissioning and Operation'''. Proceedings of the SAG 2001 Conference, Vancouver, Canada. |
||
Line 76: | Line 76: | ||
[[Benchmarking: Bond - Fort Knox|Show details of benchmarking]] |
[[Benchmarking: Bond - Fort Knox|Show details of benchmarking]] |
||
+ | |||
− | ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Meadowbank== |
||
+ | ==Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Kanowna Belle == |
||
+ | |||
+ | ''Lunt, D.J., Thompson, A. and Ritchie, I.'' '''The Design and Operation of the Kanowna Belle Milling Circuit''', SAG 1996, Pages 81-96. |
||
+ | |||
+ | {| class="wikitable" |
||
+ | |- |
||
+ | ! !! Survey !! Optimized<br>Model !! Difference !! Raw Model !! Difference |
||
+ | |- |
||
+ | | E<sub>SAG</sub> || 12.55 kWh/t || 13.27 kWh/t || +5.7% || 15.70 kWh/t || +25.1% |
||
+ | |- |
||
+ | | E<sub>ball</sub> || 9.70 kWh/t || 10.24 kWh/t || +5.6% || 12.12 kWh/t || +24.9% |
||
+ | |- |
||
+ | | E<sub>peb</sub> || 0.99 kWh/t || 1.04 kWh/t || +5.2% || 1.23 kWh/t || +24.5% |
||
+ | |- |
||
+ | | '''E<sub>total</sub>''' || '''23.24 kWh/t''' || '''24.55 kWh/t''' || '''+5.6%''' || '''29.05 kWh/t''' || '''+25.0%''' |
||
+ | |} |
||
+ | |||
+ | The ''Optimized Bond/Barratt SABC model'' better matches the survey than the'' Raw Bond/Barratt model''. |
||
+ | |||
+ | [[Benchmarking: Bond - Kanowna Belle|Show details of benchmarking]] |
||
+ | |||
+ | |||
+ | ==Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Meadowbank== |
||
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
||
Line 101: | Line 124: | ||
[[Benchmarking: Bond - Meadowbank|Show details of benchmarking]] |
[[Benchmarking: Bond - Meadowbank|Show details of benchmarking]] |
||
− | ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - |
+ | ==Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Macraes== |
+ | |||
+ | ''Barns, K., Lane, G., Osten, K. & Scagliotta, N.'', '''Benchmarking Energy Efficiency - A Case Study at Macraes Gold Mine''', Proceedings of the AusIMM MetPlant conference, Perth, Australia, September 2004. |
||
+ | |||
+ | Difference between model results and plant surveys: |
||
+ | {| class="wikitable" |
||
+ | |- |
||
+ | ! !! !! Survey 5 !! Survey 4 !! Survey 3 !! Survey 2 !! Survey 1 !! Overall<br>Average |
||
+ | |- |
||
+ | | SAG specific power || ||-5.3% ||-5.0% || 6.3% || 0.5% || 2.2% || -0.2% |
||
+ | |- |
||
+ | | ball mill specific power || ||-6.3% ||-4.7% || 3.6% || 1.9% || 3.2% || -0.5% |
||
+ | |- |
||
+ | | total specific power || ||-6.8% ||-3.8% || 5.4% || 1.4% || 2.9% || -0.2% |
||
+ | |} |
||
+ | |||
+ | [[Benchmarking: Bond - Macraes|Show details of benchmarking]] |
||
+ | |||
+ | |||
+ | ==Benchmarking: Bond/Barratt ABC Circuit Specific Energy Consumption - Santa Rita== |
||
''Latchireddi, S. & Faria, E.'', '''Achievement of High Energy Efficiency in Grinding Mills at Santa Rita''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
''Latchireddi, S. & Faria, E.'', '''Achievement of High Energy Efficiency in Grinding Mills at Santa Rita''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
||
Line 120: | Line 162: | ||
[[Benchmarking: Bond - Santa Rita|Show details of benchmarking]] |
[[Benchmarking: Bond - Santa Rita|Show details of benchmarking]] |
||
− | |||
− | ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Macraes== |
||
− | |||
− | ''Barns, K., Lane, G., Osten, K. & Scagliotta, N.'', '''Benchmarking Energy Efficiency - A Case Study at Macraes Gold Mine''', Proceedings of the AusIMM MetPlant conference, Perth, Australia, September 2004. |
||
− | |||
− | Difference between model results and plant surveys: |
||
− | {| class="wikitable" |
||
− | |- |
||
− | ! !! !! Survey 5 !! Survey 4 !! Survey 3 !! Survey 2 !! Survey 1 !! Overall<br>Average |
||
− | |- |
||
− | | SAG specific power || ||-5.3% ||-5.0% || 6.3% || 0.5% || 2.2% || -0.2% |
||
− | |- |
||
− | | ball mill specific power || ||-6.3% ||-4.7% || 3.6% || 1.9% || 3.2% || -0.5% |
||
− | |- |
||
− | | total specific power || ||-6.8% ||-3.8% || 5.4% || 1.4% || 2.9% || -0.2% |
||
− | |} |
||
− | |||
− | [[Benchmarking: Bond - Macraes|Show details of benchmarking]] |
||
− | |||
==Benchmarking: Bond/Rowland SSBM Circuit Specific Energy Consumption - Boddington == |
==Benchmarking: Bond/Rowland SSBM Circuit Specific Energy Consumption - Boddington == |
||
Line 151: | Line 174: | ||
[[Benchmarking: Bond - Boddington|Show details of benchmarking]] |
[[Benchmarking: Bond - Boddington|Show details of benchmarking]] |
||
− | |||
− | ==Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Kanowna Belle == |
||
− | |||
− | ''Lunt, D.J., Thompson, A. and Ritchie, I.'' '''The Design and Operation of the Kanowna Belle Milling Circuit''', SAG 1996, Pages 81-96. |
||
− | |||
− | {| class="wikitable" |
||
− | |- |
||
− | ! !! Survey !! Optimized<br>Model !! Difference !! Raw Model !! Difference |
||
− | |- |
||
− | | E<sub>SAG</sub> || 12.55 kWh/t || 13.27 kWh/t || +5.7% || 15.70 kWh/t || +25.1% |
||
− | |- |
||
− | | E<sub>ball</sub> || 9.70 kWh/t || 10.24 kWh/t || +5.6% || 12.12 kWh/t || +24.9% |
||
− | |- |
||
− | | E<sub>peb</sub> || 0.99 kWh/t || 1.04 kWh/t || +5.2% || 1.23 kWh/t || +24.5% |
||
− | |- |
||
− | | '''E<sub>total</sub>''' || '''23.24 kWh/t''' || '''24.55 kWh/t''' || '''+5.6%''' || '''29.05 kWh/t''' || '''+25.0%''' |
||
− | |} |
||
− | |||
− | The ''Optimized Bond/Barratt SABC model'' better matches the survey than the'' Raw Bond/Barratt model''. |
||
− | |||
− | [[Benchmarking: Bond - Kanowna Belle|Show details of benchmarking]] |
Revision as of 20:19, 16 December 2014
Contents
- 1 Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Copper Mountain
- 2 Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Fort Knox
- 3 Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Kanowna Belle
- 4 Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Meadowbank
- 5 Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Macraes
- 6 Benchmarking: Bond/Barratt ABC Circuit Specific Energy Consumption - Santa Rita
- 7 Benchmarking: Bond/Rowland SSBM Circuit Specific Energy Consumption - Boddington
Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Copper Mountain
- Morrison, R., Current Plant Conditions at Copper Mountain. Presentation to the BC/Yukon Branch Canadian Mineral Processors, November 29, 2012; Vancouver, Canada.
Result for default model conditions:
Tonnage | |
---|---|
Model | 1455 t/h |
Measured | 1600 t/h |
Difference | 145 t/h |
Difference | 9.5% |
Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Fort Knox
- Magnuson, R.; Hallow, J.; Mosher, J.; Major, K., The Fort Knox Mill: Design, Commissioning and Operation. Proceedings of the SAG 2001 Conference, Vancouver, Canada.
Optimized Bond/Barratt SABC circuit (10% Essbm calibration factor).
Result for default model conditions:
Etotal | WiO | Tonnage | |||
---|---|---|---|---|---|
Model | 11.43 | 15.90 | kWh/t | 1,607 | t/h |
Measured | 10.50 | 14.61 | kWh/t | 1,733 | t/h |
Difference | 0.93 | 1.29 | kWh/t | 126 | t/h |
Difference | 8.9% | 8.8% | 7.3% |
Model predicts 8.9% harder than survey resulting in predicted throughput 7.3% lower than survey.
Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Kanowna Belle
Lunt, D.J., Thompson, A. and Ritchie, I. The Design and Operation of the Kanowna Belle Milling Circuit, SAG 1996, Pages 81-96.
Survey | Optimized Model |
Difference | Raw Model | Difference | |
---|---|---|---|---|---|
ESAG | 12.55 kWh/t | 13.27 kWh/t | +5.7% | 15.70 kWh/t | +25.1% |
Eball | 9.70 kWh/t | 10.24 kWh/t | +5.6% | 12.12 kWh/t | +24.9% |
Epeb | 0.99 kWh/t | 1.04 kWh/t | +5.2% | 1.23 kWh/t | +24.5% |
Etotal | 23.24 kWh/t | 24.55 kWh/t | +5.6% | 29.05 kWh/t | +25.0% |
The Optimized Bond/Barratt SABC model better matches the survey than the Raw Bond/Barratt model.
Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Meadowbank
- Muteb, P. & Allaire, J., Meadowbank Mine Process Plant Throughput Increase, Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
Paper describes a "sick" SAG mill and the changes made to "bring it to health". The "healthy" mill conditions benchmark as follows:
- Actual SAG/ball motor powers (at shell): 3,168 kW / 4,105 kW
- Actual daily average throughput: 500 tonnes/hour
- Predicted SAG/ball motor powers (at shell): 3,096 kW / 4,182 kW
- Predicted nominal throughput: 500 tonnes/hour (0% difference)
SAG | Ball Mill | total | |
---|---|---|---|
Measured specific energy consumption, kWh/t | 6.34 | 8.21 | 14.55 |
Predicted specific energy consumption, kWh/t | 6.19 | 8.36 | 14.55 |
Difference, kWh/t | -0.15 | 0.15 | 0.00 |
Difference, % | -2.3% | 1.8% | 0.0% |
Benchmarking: Bond/Barratt SABC Circuit Specific Energy Consumption - Macraes
Barns, K., Lane, G., Osten, K. & Scagliotta, N., Benchmarking Energy Efficiency - A Case Study at Macraes Gold Mine, Proceedings of the AusIMM MetPlant conference, Perth, Australia, September 2004.
Difference between model results and plant surveys:
Survey 5 | Survey 4 | Survey 3 | Survey 2 | Survey 1 | Overall Average | ||
---|---|---|---|---|---|---|---|
SAG specific power | -5.3% | -5.0% | 6.3% | 0.5% | 2.2% | -0.2% | |
ball mill specific power | -6.3% | -4.7% | 3.6% | 1.9% | 3.2% | -0.5% | |
total specific power | -6.8% | -3.8% | 5.4% | 1.4% | 2.9% | -0.2% |
Benchmarking: Bond/Barratt ABC Circuit Specific Energy Consumption - Santa Rita
Latchireddi, S. & Faria, E., Achievement of High Energy Efficiency in Grinding Mills at Santa Rita, Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
Faria, E. & Latchireddi, S., Commissioning and Operation of Milling Circuit at Santa Rita Nickel Operation, Paper #137: Proceedings of the International Autogenous Grinding, Semiautogenous Grinding and High Pressure Grinding Roll Technology Conference, Vancouver, Canada, September 2011.
FAG | BM | Pebble Crusher |
total | |
---|---|---|---|---|
Measured specific energy consumption, kWh/t | 9.55 | 7.28 | 0.34 | 17.18 |
Predicted specific energy consumption, kWh/t | 9.78 | 8.33 | 0.39 | 18.50 |
Difference, kWh/t | 0.23 | 1.05 | 0.05 | 1.32 |
Difference, % | 2.4% | 14.4% | 14.7% | 7.7% |
Benchmarking: Bond/Rowland SSBM Circuit Specific Energy Consumption - Boddington
The Bond/Rowland SSBM model was fit to the observed operation of the Boddington HPGR circuit. The fitting parameters are:
- Essbm calibration factor: (-0.13)
- Mechanical efficiency of HPGR crushers: 0.28.
Because the model is specifically fit to the Boddington data, it doesn't make any meaningful throughput predictions, but the following predictions are available:
- Ball mill operating work index reduction versus laboratory: 5% (microcracking/phantom cyclone effect)
- Secondary crusher WiO is 18.1 kWh/tonne (versus laboratory determination 27.7 kWh/t).