Difference between revisions of "Benchmarking: Specific Energy Consumption Models"

From SAGMILLING.COM
Jump to: navigation, search
(Created page with "category:Bibliography category:Models category:Benchmarking ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Fort Knox== * ''Magnuson, R.; Hallow...")
(No difference)

Revision as of 19:40, 17 January 2013

Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Fort Knox

  • Magnuson, R.; Hallow, J.; Mosher, J.; Major, K., The Fort Knox Mill: Design, Commissioning and Operation. Proceedings of the SAG 2001 Conference, Vancouver, Canada.

Result for default model conditions:

Etotal WiO Tonnage
Model 11.95 16.60 kWh/t 1,522 t/h
Measured 10.50 13.97 kWh/t 1,733 t/h
Difference 1.45 2.63 kWh/t 211 t/h
Difference 12.9% 17.2% 12.9%

Show details of benchmarking

Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Copper Mountain

  • Morrison, R., Current Plant Conditions at Copper Mountain. Presentation to the BC/Yukon Branch Canadian Mineral Processors, November 29, 2012; Vancouver, Canada.

Result for default model conditions:

Tonnage
Model 1455 t/h
Measured 1600 t/h
Difference 145 t/h
Difference 9.5%


Show details of benchmarking