Difference between revisions of "Benchmarking: Bond - Fort Knox"
(→Circuit Description and Inputs) |
(→Benchmarking: Bond/Barratt - Fort Knox) |
||
Line 6: | Line 6: | ||
Checking the July 1999 survey against the Bond/Barratt model for SAB circuit. |
Checking the July 1999 survey against the Bond/Barratt model for SAB circuit. |
||
+ | |||
+ | Some additional data available in ''Hollow, J and Herbst, J.'', '''Attempting to quantify improvements in SAG liner performance in a constantly changing ore environment''', Proceedings of the SAG 2006 Conference, Vancouver, Canada. |
||
===Circuit Description and Inputs=== |
===Circuit Description and Inputs=== |
||
Line 16: | Line 18: | ||
* Product P<sub>80</sub> size= 178 µm |
* Product P<sub>80</sub> size= 178 µm |
||
* Measured E<sub>total</sub>= ''10.5 kWh/t'' relative to shell (10.1 kWh/st relative to DCS) |
* Measured E<sub>total</sub>= ''10.5 kWh/t'' relative to shell (10.1 kWh/st relative to DCS) |
||
+ | [[file:BenchmarkingModel-FortKnox-Motors.png|thumb|alt=Screenshot showing mill model|Mill & motor screenshot]] |
||
− | |||
Mill power draw is given in both Tables 4 and 6. It appears that the units in Table 4 are incorrect, and the SAG and ball mill power draw values appear to be kW, and not horsepower as stated. The power draw values from Table 6 are: |
Mill power draw is given in both Tables 4 and 6. It appears that the units in Table 4 are incorrect, and the SAG and ball mill power draw values appear to be kW, and not horsepower as stated. The power draw values from Table 6 are: |
||
* Measured SAG mill power draw= 8,910 kW (11,950 hp). |
* Measured SAG mill power draw= 8,910 kW (11,950 hp). |
||
** Assumed to be DCS indication. |
** Assumed to be DCS indication. |
||
− | ** Modelled conditions to match power draw: balls=16% v/v; filling=31% v/v; speed=75% c/s; 6" liner. |
+ | ** Modelled conditions to match power draw: balls=16.5% v/v; filling=31% v/v; speed=75% c/s; 6" liner. |
− | * Measured Ball mill power draw= 10,330 kW (13,850 hp, sum of two mills). |
+ | * Measured Ball mill power draw= 10,330 kW (13,850 hp, sum of two mills or 5165 kW/6925 HP each). |
** Assumed to be DCS indication. |
** Assumed to be DCS indication. |
||
− | ** Modelled conditions to match power draw: filling= |
+ | ** Modelled conditions to match power draw: filling=27.5% v/v; speed=72% c/s; 6" liner. |
* Measured throughput= ''1733 t/h'' (1910 st/h) |
* Measured throughput= ''1733 t/h'' (1910 st/h) |
||
Line 40: | Line 42: | ||
* Bond/Barratt model ''E<sub>total</sub>= 11.95 kWh/t'' (model 13% high) |
* Bond/Barratt model ''E<sub>total</sub>= 11.95 kWh/t'' (model 13% high) |
||
* Bond/Barrat model Wi<sub>O</sub>= ''16.6 kWh/t'' (model 13% high) |
* Bond/Barrat model Wi<sub>O</sub>= ''16.6 kWh/t'' (model 13% high) |
||
− | * Bond/Barratt model throughput= '' |
+ | * Bond/Barratt model throughput= ''1513 t/h'' (model 13% low) |
Result for default model conditions: |
Result for default model conditions: |
||
Line 54: | Line 56: | ||
| Model |
| Model |
||
| 11.95 |
| 11.95 |
||
− | | 16. |
+ | | 16.62 |
| kWh/t |
| kWh/t |
||
− | | 1, |
+ | | 1,513 |
| t/h |
| t/h |
||
|- |
|- |
||
Line 68: | Line 70: | ||
| Difference |
| Difference |
||
| 1.45 |
| 1.45 |
||
− | | |
+ | | 2.01 |
| kWh/t |
| kWh/t |
||
− | | |
+ | | 220 |
| t/h |
| t/h |
||
|- |
|- |
||
| Difference |
| Difference |
||
| 12.9% |
| 12.9% |
||
− | | |
+ | | 13.8% |
| |
| |
||
− | | 12. |
+ | | 12.7% |
| |
| |
||
|} |
|} |
Revision as of 20:13, 17 June 2014
Contents
Benchmarking: Bond/Barratt - Fort Knox
- Magnuson, R.; Hallow, J.; Mosher, J.; Major, K., The Fort Knox Mill: Design, Commissioning and Operation. Proceedings of the SAG 2001 Conference, Vancouver, Canada.
Checking the July 1999 survey against the Bond/Barratt model for SAB circuit.
Some additional data available in Hollow, J and Herbst, J., Attempting to quantify improvements in SAG liner performance in a constantly changing ore environment, Proceedings of the SAG 2006 Conference, Vancouver, Canada.
Circuit Description and Inputs
The paper is believed to report power and specific power consumption values relative to the plant DCS. It is assumed that the DCS measurement happens at the motor input leads; the conversion of DCS to shell power for synchronous motors with pinions is 0.960 × 0.985 = 0.9456.
- Work index for ball milling=13.67 kWh/t (12.4 kWh/st);
- Work index for rod milling=12.02 kWh/t (10.9 kWh/st);
- assume Work index for crushing=10 kWh/t (similar to pilot plant samples).
- Feed F80 size= 106 mm
- Product P80 size= 178 µm
- Measured Etotal= 10.5 kWh/t relative to shell (10.1 kWh/st relative to DCS)
Mill power draw is given in both Tables 4 and 6. It appears that the units in Table 4 are incorrect, and the SAG and ball mill power draw values appear to be kW, and not horsepower as stated. The power draw values from Table 6 are:
- Measured SAG mill power draw= 8,910 kW (11,950 hp).
- Assumed to be DCS indication.
- Modelled conditions to match power draw: balls=16.5% v/v; filling=31% v/v; speed=75% c/s; 6" liner.
- Measured Ball mill power draw= 10,330 kW (13,850 hp, sum of two mills or 5165 kW/6925 HP each).
- Assumed to be DCS indication.
- Modelled conditions to match power draw: filling=27.5% v/v; speed=72% c/s; 6" liner.
- Measured throughput= 1733 t/h (1910 st/h)
Circuit operating work index is given in the paper as 13.4 kWh/st, which would convert to 14.0 kWh/t at mill shell. Checking the math:
Reorganize to solve for WiO:
- Circuit operating work index to use for benchmarking is 14.6 kWh/t
Default Model Results
- Using 15% Essbm contingency (default for SAB circuit).
- Bond/Barratt model Etotal= 11.95 kWh/t (model 13% high)
- Bond/Barrat model WiO= 16.6 kWh/t (model 13% high)
- Bond/Barratt model throughput= 1513 t/h (model 13% low)
Result for default model conditions:
Etotal | WiO | Tonnage | |||
---|---|---|---|---|---|
Model | 11.95 | 16.62 | kWh/t | 1,513 | t/h |
Measured | 10.50 | 14.61 | kWh/t | 1,733 | t/h |
Difference | 1.45 | 2.01 | kWh/t | 220 | t/h |
Difference | 12.9% | 13.8% | 12.7% |
Model Tuning
The Bond/Barratt model is tuned using a calibration factor on the Single Stage Ball Mill specific energy consumption estimate (Essbm).
- Calculated Essbm = 10.39 kWh/t
- Measured Etotal = 10.50 kWh/t
- Model calibration factor = 1%