Difference between revisions of "Benchmarking: Specific Energy Consumption Models"
(→Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Copper Mountain) |
(→Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Meadowbank) |
||
| Line 76: | Line 76: | ||
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
||
| − | Paper describes a "sick" SAG mill and the changes made to "bring it to health". |
+ | Paper describes a "sick" SAG mill and the changes made to "bring it to health". The "healthy" mill conditions benchmark as follows: |
| + | |||
| + | * Actual SAG/ball motor powers (at shell): 3,168 kW / 4,105 kW |
||
| + | * Actual daily average throughput: 500 tonnes/hour |
||
| + | * Predicted SAG/ball motor powers (at shell): 3,096 kW / 4,182 kW |
||
| + | * Predicted nominal throughput: 535 tonnes/hour (+6% difference) |
||
| + | |||
| + | {|class="wikitable" border="1" |
||
| + | ! !!SAG!!Ball Mill!!total |
||
| + | |- |
||
| + | | Measured specific energy consumption, kWh/t||6.34||8.21||14.55 |
||
| + | |- |
||
| + | | Predicted specific energy consumption, kWh/t||6.19||8.36||14.55 |
||
| + | |- |
||
| + | | Difference, kWh/t||-0.15||0.15||0.00 |
||
| + | |- |
||
| + | | Difference, %||-2.3%||1.8%||0.0% |
||
| + | |} |
||
[[Benchmarking: Bond - Meadowbank|Show details of benchmarking]] |
[[Benchmarking: Bond - Meadowbank|Show details of benchmarking]] |
||
Revision as of 01:43, 27 January 2013
Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Fort Knox
- Magnuson, R.; Hallow, J.; Mosher, J.; Major, K., The Fort Knox Mill: Design, Commissioning and Operation. Proceedings of the SAG 2001 Conference, Vancouver, Canada.
Result for default model conditions:
| Etotal | WiO | Tonnage | |||
|---|---|---|---|---|---|
| Model | 11.95 | 16.60 | kWh/t | 1,522 | t/h |
| Measured | 10.50 | 13.97 | kWh/t | 1,733 | t/h |
| Difference | 1.45 | 2.63 | kWh/t | 211 | t/h |
| Difference | 12.9% | 17.2% | 12.9% |
Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Copper Mountain
- Morrison, R., Current Plant Conditions at Copper Mountain. Presentation to the BC/Yukon Branch Canadian Mineral Processors, November 29, 2012; Vancouver, Canada.
Result for default model conditions:
| Tonnage | |
|---|---|
| Model | 1455 t/h |
| Measured | 1600 t/h |
| Difference | 145 t/h |
| Difference | 9.5% |
Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Meadowbank
- Muteb, P. & Allaire, J., Meadowbank Mine Process Plant Throughput Increase, Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
Paper describes a "sick" SAG mill and the changes made to "bring it to health". The "healthy" mill conditions benchmark as follows:
- Actual SAG/ball motor powers (at shell): 3,168 kW / 4,105 kW
- Actual daily average throughput: 500 tonnes/hour
- Predicted SAG/ball motor powers (at shell): 3,096 kW / 4,182 kW
- Predicted nominal throughput: 535 tonnes/hour (+6% difference)
| SAG | Ball Mill | total | |
|---|---|---|---|
| Measured specific energy consumption, kWh/t | 6.34 | 8.21 | 14.55 |
| Predicted specific energy consumption, kWh/t | 6.19 | 8.36 | 14.55 |
| Difference, kWh/t | -0.15 | 0.15 | 0.00 |
| Difference, % | -2.3% | 1.8% | 0.0% |