Line 32: Line 32:
   
 
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
 
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
 
The ball mill design given as:
 
* Diameter inside shell: 18 ft
 
* Length (assumed to be flange-to-flange length): 29 ft
 
* Effective grinding length: 28.5 ft (using rule-of-thumb half-foot basis)
 
* Motor size: 6,000 horsepower (4,474 kW)
 
* Overflow mill with synchronous motor assumed
 
 
The operating conditions of the May 2012 survey, including the pre-crushing circuit given as:
 
* Mill speed 14.19 rpm (75% critical)
 
* Volumetric filling 30.6% v/v
 
* Ball charge 30.6% v/v
 
* Ore density 2.93 kg/L
 
* Grindability: A&times;b 38.6; Wi<sub>BM</sub> 10.9 kWh/t
 
 
Liners assumed to be an effective thickness of 3 inches. DCS power is assumed to be indicated (mill power measurements &times; 0.985 pinion &times; 0.96 motor eff equals power "at mill shell"). Model power measurements are shown "at DCS".
 
   
 
{| class="wikitable" border="1"
 
{| class="wikitable" border="1"

Revision as of 00:36, 27 January 2013

Benchmarking: Ball Mill Power Draw - Fimiston

  • Nelson, M; Valery, W; Morrell, S, Performance Characteristics and Optimisation of the Fimiston (KCGM) SAG Mill Circuit, Page 233 - 248, SAG 1996 Conference, Vancouver, Canada.
Survey Survey Power,
kW at input
Mill speed,
%critical
Total load,
%v/v
Pulp %solids,
w/w
Morrell SAG Model,
kW at input / shell
Nordberg Model,
kW at input / shell
Survey 1 3,864 68.3 38.7 72.0 3,933 / 3,776 3,592 / 3,345
  • Morrell model predicts 2% high
  • Nordberg model predicts 7% low

See details of benchmarking

Benchmarking: Ball Mill Power Draw - Meadowbank

  • Muteb, P. & Allaire, J., Meadowbank Mine Process Plant Throughput Increase, Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
DCS Power, kW Mill filling Morrell Model, kW Nordberg model, kW
May 2012 4,341 30.6% v/v 4,765 (+9.3%) 4,423 (+1.9%)

See details of benchmarking