Difference between revisions of "Benchmarking: Specific Energy Consumption Models"
(Created page with "category:Bibliography category:Models category:Benchmarking ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Fort Knox== * ''Magnuson, R.; Hallow...") |
(→Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Copper Mountain) |
||
Line 71: | Line 71: | ||
[[Benchmarking: Bond - Copper Mountain|Show details of benchmarking]] |
[[Benchmarking: Bond - Copper Mountain|Show details of benchmarking]] |
||
+ | |||
+ | ==Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Meadowbank== |
||
+ | |||
+ | * ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
||
+ | |||
+ | Paper describes a "sick" SAG mill and the changes made to "bring it to health". |
||
+ | |||
+ | [[Benchmarking: Bond - Meadowbank|Show details of benchmarking]] |
Revision as of 00:26, 27 January 2013
Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Fort Knox
- Magnuson, R.; Hallow, J.; Mosher, J.; Major, K., The Fort Knox Mill: Design, Commissioning and Operation. Proceedings of the SAG 2001 Conference, Vancouver, Canada.
Result for default model conditions:
Etotal | WiO | Tonnage | |||
---|---|---|---|---|---|
Model | 11.95 | 16.60 | kWh/t | 1,522 | t/h |
Measured | 10.50 | 13.97 | kWh/t | 1,733 | t/h |
Difference | 1.45 | 2.63 | kWh/t | 211 | t/h |
Difference | 12.9% | 17.2% | 12.9% |
Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Copper Mountain
- Morrison, R., Current Plant Conditions at Copper Mountain. Presentation to the BC/Yukon Branch Canadian Mineral Processors, November 29, 2012; Vancouver, Canada.
Result for default model conditions:
Tonnage | |
---|---|
Model | 1455 t/h |
Measured | 1600 t/h |
Difference | 145 t/h |
Difference | 9.5% |
Benchmarking: Bond/Barratt Circuit Specific Energy Consumption - Meadowbank
- Muteb, P. & Allaire, J., Meadowbank Mine Process Plant Throughput Increase, Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
Paper describes a "sick" SAG mill and the changes made to "bring it to health".