(Created page with "Category:Bibliography Category:Models Category:Benchmarking ==Benchmarking: Ball Mill Power Draw - Fimiston== * ''Nelson, M; Valery, W; Morrell, S'', '''Performanc...") |
|||
| Line 28: | Line 28: | ||
[[Benchmarking: Fimiston Ball Mills|See details of benchmarking]] |
[[Benchmarking: Fimiston Ball Mills|See details of benchmarking]] |
||
==Benchmarking: Ball Mill Power Draw - Meadowbank== |
|||
* ''Muteb, P. & Allaire, J.'', '''Meadowbank Mine Process Plant Throughput Increase''', Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013. |
|||
The ball mill design given as: |
|||
* Diameter inside shell: 18 ft |
|||
* Length (assumed to be flange-to-flange length): 29 ft |
|||
* Effective grinding length: 28.5 ft (from block flow diagram) |
|||
* Motor size: horsepower ( kW) |
|||
* Overflow mill assumed |
|||
The operating conditions of the May 2012 survey, including the pre-crushing circuit given as: |
|||
* Mill speed 14.19 rpm (75% critical) |
|||
* Volumetric filling 30.6% v/v |
|||
* Ball charge 30.6% v/v |
|||
* Ore density 2.93 kg/L |
|||
* Grindability: A×b 38.6; Wi<sub>BM</sub> 10.9 kWh/t |
|||
Liners assumed to be an effective thickness of 3 inches. DCS power is assumed to be indicated (mill power measurements × 0.985 pinion × 0.96 motor eff equals power "at mill shell"). Model power measurements are shown "at DCS". |
|||
{| class="wikitable" border="1" |
|||
|- |
|||
! |
|||
! DCS Power, kW |
|||
! Mill filling |
|||
! Morrell Model, kW |
|||
! Loveday/Barratt model, kW |
|||
! Austin model, kW |
|||
|- |
|||
| May 2012 |
|||
| 4,341 |
|||
| 30.6% v/v |
|||
| (-3.3%) |
|||
| (+7.3%) |
|||
| (-3.0%) |
|||
|} |
|||
Revision as of 22:04, 26 January 2013
Benchmarking: Ball Mill Power Draw - Fimiston
- Nelson, M; Valery, W; Morrell, S, Performance Characteristics and Optimisation of the Fimiston (KCGM) SAG Mill Circuit, Page 233 - 248, SAG 1996 Conference, Vancouver, Canada.
| Survey | Survey Power, kW at input |
Mill speed, %critical |
Total load, %v/v |
Pulp %solids, w/w |
Morrell SAG Model, kW at input / shell |
Nordberg Model, kW at input / shell |
|---|---|---|---|---|---|---|
| Survey 1 | 3,864 | 68.3 | 38.7 | 72.0 | 3,933 / 3,776 | 3,592 / 3,345 |
- Morrell model predicts 2% high
- Nordberg model predicts 7% low
Benchmarking: Ball Mill Power Draw - Meadowbank
- Muteb, P. & Allaire, J., Meadowbank Mine Process Plant Throughput Increase, Proceedings of the Canadian Mineral Processors Annual General Meeting, Ottawa, Canada, January 2013.
The ball mill design given as:
- Diameter inside shell: 18 ft
- Length (assumed to be flange-to-flange length): 29 ft
- Effective grinding length: 28.5 ft (from block flow diagram)
- Motor size: horsepower ( kW)
- Overflow mill assumed
The operating conditions of the May 2012 survey, including the pre-crushing circuit given as:
- Mill speed 14.19 rpm (75% critical)
- Volumetric filling 30.6% v/v
- Ball charge 30.6% v/v
- Ore density 2.93 kg/L
- Grindability: A×b 38.6; WiBM 10.9 kWh/t
Liners assumed to be an effective thickness of 3 inches. DCS power is assumed to be indicated (mill power measurements × 0.985 pinion × 0.96 motor eff equals power "at mill shell"). Model power measurements are shown "at DCS".
| DCS Power, kW | Mill filling | Morrell Model, kW | Loveday/Barratt model, kW | Austin model, kW | |
|---|---|---|---|---|---|
| May 2012 | 4,341 | 30.6% v/v | (-3.3%) | (+7.3%) | (-3.0%) |