Difference between revisions of "Model:Morrell Mi SMC SAG"

From SAGMILLING.COM
Jump to: navigation, search
(Transfer size)
(Optional parameters)
 
(18 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
[[category:Specific Energy Models]]
 
[[category:Specific Energy Models]]
 
[[Category:SMC Model]]
 
[[Category:SMC Model]]
== Morrell SMC SAG & ball mill Model ==
+
== Morrell Mi (SMC) SAG & ball mill Model ==
 
This is a SAG or AG mill plus ball mill model that estimates the specific energy consumption (E<sub>SAG</sub>) using the equations of Morrell (2004).
 
This is a SAG or AG mill plus ball mill model that estimates the specific energy consumption (E<sub>SAG</sub>) using the equations of Morrell (2004).
   
   
 
===Testwork Required===
 
===Testwork Required===
* [[Testwork: Drop weight test|The SMC™ test]], stored in the "DWT" testwork table (a Drop Weight Test).
+
* [[Testwork: Drop weight test|The SMC™ test]], stored in the "DWT" testwork table (SMC is a Drop Weight Test).
* [[Testwork: Bond ball mill work index|Bond ball mill work index]]. The method requires '''all the elements''' of the ball mill work index test to be filled in:
+
* [[Testwork: Bond ball mill work index|Bond ball mill work index]]. The method requires '''all the following elements''' of the ball mill work index test to be filled in:
 
** Ball mill Wi test closing screen size, ''umclosing'', µm
 
** Ball mill Wi test closing screen size, ''umclosing'', µm
 
** Ball mill Wi test product size, ''P<sub>80</sub>'', µm
 
** Ball mill Wi test product size, ''P<sub>80</sub>'', µm
Line 19: Line 19:
 
* '''Availability''', expressed as a decimal (0.90 = 90% availability) is used to convert t/h to t/d.
 
* '''Availability''', expressed as a decimal (0.90 = 90% availability) is used to convert t/h to t/d.
 
* Ball mill '''Operating strategy''' when circuit is SAG-limited (note, fixed speed ball mills can only be ''vary P<sub>80</sub>'')
 
* Ball mill '''Operating strategy''' when circuit is SAG-limited (note, fixed speed ball mills can only be ''vary P<sub>80</sub>'')
  +
   
 
===Optional parameters===
 
===Optional parameters===
 
* '''Description''' and '''Comment''' are optional text fields
 
* '''Description''' and '''Comment''' are optional text fields
* '''Maximum t/h limit''' is a t/h throughput above which a warning message is displayed (but does not actually limit the throughput).
+
* '''Maximum t/h limit''' is a t/h throughput above which the SAG and ball mills will turn down by, for example, grinding out.
 
* '''T<sub>80</sub> min''' and '''T<sub>80</sub> min''' override the transfer size restrictions built into the model
 
* '''T<sub>80</sub> min''' and '''T<sub>80</sub> min''' override the transfer size restrictions built into the model
 
* [[Ball mill work index adjustment]] used to adjust Wi<sub>BM</sub> for different P<sub>80</sub> sizes.
 
* [[Ball mill work index adjustment]] used to adjust Wi<sub>BM</sub> for different P<sub>80</sub> sizes.
 
** '''coefficient (a)''', the fitted coefficient to the adjustment equation
 
** '''coefficient (a)''', the fitted coefficient to the adjustment equation
  +
* '''CFball calibration factor''', model tuning factor for "W_b" fine component of E<sub>total</sub>
** '''exponent (b)''', the fitted exponent to the adjustment equation
 
* '''CFsag calibration factor''', model tuning factor for E<sub>ASAG</sub>
+
* '''CFsag calibration factor''', model tuning factor for E<sub>ASAG</sub> and "W_a" coarse component of E<sub>total</sub>
  +
  +
(raw ''E'' gets multiplied by these calibration factors, so ''E'' > 1 decreases tonnage; ''E'' < 1 increases tonnage)
   
 
===Formulae===
 
===Formulae===
 
The method is superficially similar to Bond (among other models), but with a variable exponent on size defined by:
 
The method is superficially similar to Bond (among other models), but with a variable exponent on size defined by:
  +
 
<math>f(x) = - 0.295 - \frac{x}{10^6}</math>
 
<math>f(x) = - 0.295 - \frac{x}{10^6}</math>
   
 
Where ''x'' is the particle 80% passing size in µm.
 
Where ''x'' is the particle 80% passing size in µm.
   
<math>E_{total} = 4 \times Mia \left( 750^{f(750)} - F_{80}^{f(F_{80})} \right) \times CFsag + 4 \times Mib \left( P_{80}^{f(P_{80})} - 750^{f(750)} \right)
+
SAB circuit: <math>E_{total} = 4 \times Mia \left( 750^{f(750)} - F_{80}^{f(F_{80})} \right) \times 1.00 \times CFsag + 4 \times Mib \left( P_{80}^{f(P_{80})} - 750^{f(750)} \right) \times CFball
 
</math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2004]]</sup>
 
</math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2004]]</sup>
   
<math>E_{SAG} = 4 \times Mia \left( P_{80}^{f(P_{80})} - F_{80}^{f(F_{80})} \right) \times CFsag
+
SABC circuit: <math>E_{total} = 4 \times Mia \left( 750^{f(750)} - F_{80}^{f(F_{80})} \right) \times 0.95 \times CFsag + 4 \times Mib \left( P_{80}^{f(P_{80})} - 750^{f(750)} \right) \times CFball
  +
+ 4 \times Mic \left( CSS^{f(CSS)} - PEB^{f(PEB)} \times \text{fract circulating load} \right)
 
</math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2004]]</sup>
 
</math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2004]]</sup>
  +
  +
<math>E_{SAG} = 4 \times Mia \left( T_{80}^{f(T_{80})} - F_{80}^{f(F_{80})} \right) \times CFsag
  +
</math><sup>[[Bibliography:_Specific_energy_consumption_models|based on Doll 2013, but note Morrell, 2011]]</sup>
   
 
<math>E_{ball} = E_{total} - E_{SAG} </math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2004]]</sup>
 
<math>E_{ball} = E_{total} - E_{SAG} </math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2004]]</sup>
  +
  +
Circuits with a pebble crusher have an extra term to account for the pebble crusher specific energy, which requires an estimate of the pebble crusher F<sub>80</sub> (''PEB'', the size of the pebbles as µm) and the pebble crusher product P<sub>80</sub> (approximately the crusher's closed side setting as µm, ''CSS''). The quantity of material passing through the pebble crusher is also required, expressed as a fraction of the fresh feed rate to the SAG circuit. Pebble crushers are expected to operate in open circuit, so the open circuit factor 1.19 applies.
  +
  +
<math>E_{peb} = 4 \times Mic \left( CSS^{f(CSS)} - PEB^{f(PEB)} \right) \times 1.19 \times \text{fract circulating load}
  +
</math><sup>[[Bibliography:_Specific_energy_consumption_models|Morrell, 2009]]</sup>
  +
  +
For the purposes of simulations (and because the E<sub>peb</sub> term tends to be small), the following conditions are assumed:
  +
* fraction of circulating load = 0.15
  +
* pebble crusher CSS (P<sub>80</sub>) = 12.5 mm
  +
* pebble dimension (F<sub>80</sub>) = 35 mm
   
 
===CF<sub>sag</sub> calibration factor===
 
===CF<sub>sag</sub> calibration factor===
Line 48: Line 66:
 
* Base value, SAB circuit (no pebble crushing, ~6 inch SAG feed), CF<sub>sag</sub> = 1.00
 
* Base value, SAB circuit (no pebble crushing, ~6 inch SAG feed), CF<sub>sag</sub> = 1.00
 
* Pebble crushing, SABC circuit, CF<sub>sag</sub> = 0.95
 
* Pebble crushing, SABC circuit, CF<sub>sag</sub> = 0.95
  +
   
 
===Transfer size===
 
===Transfer size===
Morrell specifically discourages use of transfer size in calculations such as those in SAGMILLING.COM for a variety of reasons (see discussion in Morrell, SAG 2011). Unfortunately, the alternative method proposed by Morrell is a complex equation that requires pre-selected mill sizes and a series of unpublished calibration factors. This alternative method is not practical for the calculations in SAGMILLING.COM, so a transfer size approach is used instead.
+
Morrell specifically discourages use of transfer size in calculations such as those in SAGMILLING.COM for a variety of reasons (see discussion in [[Bibliography: Specific energy consumption models|Morrell, SAG 2011]]). Unfortunately, the alternative method proposed by Morrell is an equation that requires pre-selected mill sizes and a series of unpublished calibration factors. A calibration attempt by Paul Díaz (Procemin, 2015) shows wildly different fitted parameters for different Chilean operating mills. Morrell's alternative method is not practical for the calculations in SAGMILLING.COM (at least, not yet), so a transfer size approach is used instead.
   
 
The modelled transfer sizes are "Bond-compatible" and not similar to what would be measured directly in a plant survey. Plant survey results would need to be subjected to a [[phantom cyclone]] calculation before they are comparable to the model predictions.
 
The modelled transfer sizes are "Bond-compatible" and not similar to what would be measured directly in a plant survey. Plant survey results would need to be subjected to a [[phantom cyclone]] calculation before they are comparable to the model predictions.

Latest revision as of 15:56, 30 August 2023

Morrell Mi (SMC) SAG & ball mill Model

This is a SAG or AG mill plus ball mill model that estimates the specific energy consumption (ESAG) using the equations of Morrell (2004).


Testwork Required

  • The SMC™ test, stored in the "DWT" testwork table (SMC is a Drop Weight Test).
  • Bond ball mill work index. The method requires all the following elements of the ball mill work index test to be filled in:
    • Ball mill Wi test closing screen size, umclosing, µm
    • Ball mill Wi test product size, P80, µm
    • Ball mill Wi test feed size, F80, µm
    • Ball mill Wi grams per revolution at test conclusion, gpr

Required parameters

  • F80, µm is the 80% passing size of the fresh feed to the circuit (expected to be a Bond-compatible size distribution).
  • P80, µm is the 80% passing size of the circuit product (expected to be a Bond-compatible size distribution).
  • Availability, expressed as a decimal (0.90 = 90% availability) is used to convert t/h to t/d.
  • Ball mill Operating strategy when circuit is SAG-limited (note, fixed speed ball mills can only be vary P80)


Optional parameters

  • Description and Comment are optional text fields
  • Maximum t/h limit is a t/h throughput above which the SAG and ball mills will turn down by, for example, grinding out.
  • T80 min and T80 min override the transfer size restrictions built into the model
  • Ball mill work index adjustment used to adjust WiBM for different P80 sizes.
    • coefficient (a), the fitted coefficient to the adjustment equation
  • CFball calibration factor, model tuning factor for "W_b" fine component of Etotal
  • CFsag calibration factor, model tuning factor for EASAG and "W_a" coarse component of Etotal

(raw E gets multiplied by these calibration factors, so E > 1 decreases tonnage; E < 1 increases tonnage)

Formulae

The method is superficially similar to Bond (among other models), but with a variable exponent on size defined by:

f(x) = - 0.295 - \frac{x}{10^6}

Where x is the particle 80% passing size in µm.

SAB circuit: E_{total} = 4 \times Mia \left( 750^{f(750)} - F_{80}^{f(F_{80})} \right) \times 1.00 \times CFsag + 4 \times Mib \left( P_{80}^{f(P_{80})} - 750^{f(750)} \right) \times CFball
Morrell, 2004

SABC circuit: E_{total} = 4 \times Mia \left( 750^{f(750)} - F_{80}^{f(F_{80})} \right) \times 0.95 \times CFsag + 4 \times Mib \left( P_{80}^{f(P_{80})} - 750^{f(750)} \right) \times CFball
+ 4 \times Mic \left( CSS^{f(CSS)} - PEB^{f(PEB)} \times \text{fract circulating load} \right)
Morrell, 2004

E_{SAG} = 4 \times Mia \left( T_{80}^{f(T_{80})} - F_{80}^{f(F_{80})} \right) \times CFsag
based on Doll 2013, but note Morrell, 2011

E_{ball} = E_{total} - E_{SAG} Morrell, 2004

Circuits with a pebble crusher have an extra term to account for the pebble crusher specific energy, which requires an estimate of the pebble crusher F80 (PEB, the size of the pebbles as µm) and the pebble crusher product P80 (approximately the crusher's closed side setting as µm, CSS). The quantity of material passing through the pebble crusher is also required, expressed as a fraction of the fresh feed rate to the SAG circuit. Pebble crushers are expected to operate in open circuit, so the open circuit factor 1.19 applies.

E_{peb} = 4 \times Mic \left( CSS^{f(CSS)} - PEB^{f(PEB)} \right) \times 1.19 \times \text{fract circulating load}
Morrell, 2009

For the purposes of simulations (and because the Epeb term tends to be small), the following conditions are assumed:

  • fraction of circulating load = 0.15
  • pebble crusher CSS (P80) = 12.5 mm
  • pebble dimension (F80) = 35 mm

CFsag calibration factor

The CFsag factor is used to reflect the effect of pebble crushing on the overall circuit performance. This value is automatically selected if you leave this field blank in the model configuration settings.

  • Base value, SAB circuit (no pebble crushing, ~6 inch SAG feed), CFsag = 1.00
  • Pebble crushing, SABC circuit, CFsag = 0.95


Transfer size

Morrell specifically discourages use of transfer size in calculations such as those in SAGMILLING.COM for a variety of reasons (see discussion in Morrell, SAG 2011). Unfortunately, the alternative method proposed by Morrell is an equation that requires pre-selected mill sizes and a series of unpublished calibration factors. A calibration attempt by Paul Díaz (Procemin, 2015) shows wildly different fitted parameters for different Chilean operating mills. Morrell's alternative method is not practical for the calculations in SAGMILLING.COM (at least, not yet), so a transfer size approach is used instead.

The modelled transfer sizes are "Bond-compatible" and not similar to what would be measured directly in a plant survey. Plant survey results would need to be subjected to a phantom cyclone calculation before they are comparable to the model predictions.