Benchmarking: SGI - Macraes

From SAGMILLING.COM
Revision as of 16:07, 21 October 2015 by Alex Doll (talk | contribs) (Created page with "category: Benchmarking category: Amelunxen SGI Model category:Bibliography ==Benchmarking: Amelunxen SGI Circuit Specific Energy Consumption - Macraes== ''Barns, ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Benchmarking: Amelunxen SGI Circuit Specific Energy Consumption - Macraes

Barns, K., Lane, G., Osten, K. & Scagliotta, N., Benchmarking Energy Efficiency - A Case Study at Macraes Gold Mine, Proceedings of the AusIMM MetPlant conference, Perth, Australia, September 2004.

Raw data from paper

The paper describes overall plant unit operation efficiency rather that specific grinding mill surveys, but does reference five surveys that are useful for benchmarking.

Survey 5 Survey 4 Survey 3 Survey 2 Survey 1
throughput dry t/h 536 454 493 514 527
SAG feed F80 mm 82.9 106.8 72.7 56.8 51.4
SAG specific power kW at DCS 3.84 5.04 4.32 4.02 3.76
ball mill specific power kW at DCS 8.60 8.76 7.78 7.86 7.63
transfer size, T80 µm 795 3318 804 2215 2043
cyclone overflow size, P80 µm 100 100 100 117 116
grindability, SPI minutes 40.7 46.3 43.2 34.7 40.5
grindability, WiBM kWh/t 10.3 11.6 11.3 11.9 11.4

Interpretation

Assume that the power provided at the motor input is converted to shell power using 0.96 motor efficiency and 0.985 gear efficiency for an overall conversion of 0.9456.

Other published information on Macraes state that there is a pebble crusher in the circuit, but no crusher size or power draws are published. Assume a 400 HP crusher for the purposes of modelling.

Survey 5 Survey 4 Survey 3 Survey 2 Survey 1
SAG specific power kW at shell 3.6 4.8 4.1 3.8 3.6
ball mill specific power kW at shell 8.1 8.3 7.4 7.4 7.2
total specific power* kW at shell 11.8 13.0 11.4 11.2 10.8
Ball mill Operating work index, WiO kWh/t 12.6 10.0 11.4 10.4 10.2
CFball values actual 1.22 0.86 1.01 0.88 0.90

* includes allowance for pebble crushing

The calculated operating work index values permit CFball values to be determined for each of the surveys. This factor includes any phantom cyclone effect and any accumulated Rowland efficiency factors. For the purposes of modelling, the CFball values are predicted using Amelunxen's method and will be compared to the actual measurements.

Because full mill surveys aren't given, abbreviated model runs are used in this benchmarking rather than full models (there is no saved data to view).

Use Amelunxen SGI model with pebble crushing, fine feed (where appropriate) and predicted CF factors.

Model Results

Survey 5 Survey 4 Survey 3 Survey 2 Survey 1
SAG specific power kW at shell 3.79 4.98 4.71 3.83 3.77
ball mill specific power kW at shell 8.5 8.64 8.49 7.55 7.68
total specific power* kW at shell 12.64 14.03 13.62 11.73 11.81
transfer size, T80
to achieve ESAG/Eball ratio
µm 2864 1419 1485 1374 1429
Ball mill operating Wo kWh/t 10.45 11.77 11.46 11.53 11.56
CFball predicted 1.01 1.01 1.01 0.97 0.97

* includes allowance for pebble crushing


Comparison

Difference between model results and plant surveys:

Survey 5 Survey 4 Survey 3 Survey 2 Survey 1 Overall
Average
SAG specific power 4.4% 4.5% 15.3% 0.8% 6.0% 6.2%
ball mill specific power 4.5% 4.3% 15.5% 1.6% 6.4% 6.5%
total specific power 4.5% 4.4% 15.4% 1.3% 6.3% 6.4%
CFball -17.5% 16.9% 0.5% 10.6% 8.3% 3.8%

The overall specific energy consumption predictions of the model are conservative by about 6%. The CFball predictions are within 4% overall, but can be wildly different on any particular sample.