Difference between revisions of "User:Alex Doll"

From SAGMILLING.COM
Jump to: navigation, search
(Test suite before deploying new code)
(Alex's to-do lists)
Line 10: Line 10:
 
# Switch to the new Client and check that the database is populated correctly
 
# Switch to the new Client and check that the database is populated correctly
 
# Email the new administrator with credentials and URL.
 
# Email the new administrator with credentials and URL.
# Remind people that if they get a certificate error, just accept the cert and continue.
 
   
 
===Test suite before deploying new code===
 
===Test suite before deploying new code===

Revision as of 18:42, 5 December 2019

Alex's to-do lists

Stuff that Alex needs to not forget.

Setting up a new project

  1. Click the Administration button
  2. Create a new Client
    1. Assign the new administrator
    2. The database structure, including default data, will populate.
    3. Check that indexing of table index fields is active
  3. Switch to the new Client and check that the database is populated correctly
  4. Email the new administrator with credentials and URL.

Test suite before deploying new code

On the development server

  1. create a new project
    1. add a user to this new project
  2. create a new test result
    1. Add the 3 work index values
    2. check these appear in the Testwork Summary listing
    3. check these appear in the testwork comparison charts
  3. delete a test result. delete a whole sample.
  4. create a new optimized Bond SABC circuit
    1. create new mill for the new circuit from templates or from blanks
    2. check tent diagram
    3. change to raw Bond circuit
  5. create a new SSBM circuit
    1. create new mill for the new circuit from templates or from blanks
  6. create a new SSSAG circuit
    1. create new mill for the new circuit from templates or from blanks
  7. create a new template mill for a SAG mill, a pebble crusher and a ball mill.


Compare the Example project on development server versus main server

  1. View model output table of a circuit
    1. Pull up some summary charts
    2. Check some SAG-limited samples
    3. Check some ball-limited samples
    4. Run the PDF report, confirm percentile samples against the HTML list.
  2. Check the result table totals are the same
  3. Edit a SAG mill; change the model on a SAG mill
    1. check a tent diagram
    2. change speed or filling on tent diagram
  4. Edit a ball mill; change the model on a ball mill
    1. check a tent diagram
    2. change speed or filling on tent diagram
  5. Manually override the test results and the F80, P80 sizes
  6. Edit a crusher