Difference between revisions of "User:Alex Doll"
(→Test suite before deploying new code) |
(→Test suite before deploying new code) |
||
(One intermediate revision by the same user not shown) | |||
Line 10: | Line 10: | ||
# Switch to the new Client and check that the database is populated correctly |
# Switch to the new Client and check that the database is populated correctly |
||
# Email the new administrator with credentials and URL. |
# Email the new administrator with credentials and URL. |
||
− | # Remind people that if they get a certificate error, just accept the cert and continue. |
||
===Test suite before deploying new code=== |
===Test suite before deploying new code=== |
||
Line 45: | Line 44: | ||
## check a tent diagram |
## check a tent diagram |
||
## change speed or filling on tent diagram |
## change speed or filling on tent diagram |
||
− | # Manually override the test results and the F80, P80 sizes |
+ | # Manually override the test results and the F80, P80 sizes (use the data entry fields on the flowsheet page) |
# Edit a crusher |
# Edit a crusher |
Latest revision as of 17:01, 24 June 2020
Alex's to-do lists
Stuff that Alex needs to not forget.
Setting up a new project
- Click the Administration button
- Create a new Client
- Assign the new administrator
- The database structure, including default data, will populate.
- Check that indexing of table index fields is active
- Switch to the new Client and check that the database is populated correctly
- Email the new administrator with credentials and URL.
Test suite before deploying new code
On the development server
- create a new project
- add a user to this new project
- create a new test result
- Add the 3 work index values
- check these appear in the Testwork Summary listing
- check these appear in the testwork comparison charts
- delete a test result. delete a whole sample.
- create a new optimized Bond SABC circuit
- create new mill for the new circuit from templates or from blanks
- check tent diagram
- change to raw Bond circuit
- create a new SSBM circuit
- create new mill for the new circuit from templates or from blanks
- create a new SSSAG circuit
- create new mill for the new circuit from templates or from blanks
- create a new template mill for a SAG mill, a pebble crusher and a ball mill.
Compare the Example project on development server versus main server
- View model output table of a circuit
- Pull up some summary charts
- Check some SAG-limited samples
- Check some ball-limited samples
- Run the PDF report, confirm percentile samples against the HTML list.
- Check the result table totals are the same
- Edit a SAG mill; change the model on a SAG mill
- check a tent diagram
- change speed or filling on tent diagram
- Edit a ball mill; change the model on a ball mill
- check a tent diagram
- change speed or filling on tent diagram
- Manually override the test results and the F80, P80 sizes (use the data entry fields on the flowsheet page)
- Edit a crusher