Difference between revisions of "User:Alex Doll"
(→Test suite before deploying new code) |
(→Test suite before deploying new code) |
||
Line 26: | Line 26: | ||
## Check some SAG-limited samples |
## Check some SAG-limited samples |
||
## Check some ball-limited samples |
## Check some ball-limited samples |
||
+ | ## Run the PDF report, confirm percentile samples against the HTML list. |
||
# Check the result table totals are the same |
# Check the result table totals are the same |
||
# Edit a SAG mill; change the model on a SAG mill |
# Edit a SAG mill; change the model on a SAG mill |
||
Line 32: | Line 33: | ||
## check a tent diagram |
## check a tent diagram |
||
# Edit a crusher |
# Edit a crusher |
||
− | # View '''PDF report''' for a model |
Revision as of 18:04, 9 May 2014
Alex's to-do lists
Stuff that Alex needs to not forget.
Setting up a new project
- Click the Administration button
- Create a new Client
- Assign the new administrator
- The database structure, including default data, will populate.
- Switch to the new Client and check that the database is populated correctly
- Email the new administrator with credentials and URL.
- Remind people that if they get a certificate error, just accept the cert and continue.
Test suite before deploying new code
On the development server
- create a new project
- create a new test result
- delete a test result
- create a new mill for a new circuit
- create a new circuit containing that new mill
- create a new template mill for a SAG mill, a pebble crusher and a ball mill.
Compare the Example project on development server versus main server
- View model output table of a circuit
- Pull up some summary charts
- Check some SAG-limited samples
- Check some ball-limited samples
- Run the PDF report, confirm percentile samples against the HTML list.
- Check the result table totals are the same
- Edit a SAG mill; change the model on a SAG mill
- check a tent diagram
- Edit a ball mill; change the model on a ball mill
- check a tent diagram
- Edit a crusher